A HYPOTHETICAL ILLUSTRATION on BOILER’s PERFORMANCE RESULT
As per my experience & knowledge, I am going to illustrate a hypothetical data on achievement of boiler performance result
AIM OF THIS HYPOTHETICAL ILLUSTRATION:
To achieve required contractual obligation, necessary changes (Manipulation Done in Fuel, Moisture, Ash, Unburnt Samples & Emission-SPM Reports, Log Sheet, Aux Power Consumption, Design Correction Curve / Assumption & Calculation etc) carried out before submission the performance result to customer
METHODOLOGY USED IN ABOVE HYPOTHETICAL ILLUSTRATION:
- SPM - Test Result are edited for Emission, SOx, NOx, very frequently in TG+Slop, at site / after test
- Fuel - Changes incorporated in GCV, Fuel Moisture, Ash, Hydrogen OR by correction curves
- Ash - Changes incorporated in Unburnt %age, Ash Collection Ratio, Ash temperature OR by correction curves
- Aux Power Consumption - Changes incorporated during data collection at site, Setting of instruments & meters OR by correction curves
- ESP Exit Gas Temp - Changes incorporated during data collection at site, Setting of instruments & display OR by correction curves
- Steam & Water - Changes incorporated in Silica, Conductivity OR Sample replacement
- Correction Curve - Preparation is based on customer’s contractual obligation
- Log data - Changes incorporated during data collection, Setting of instruments & DCS
Read details in attachment